Blog

Canal Reopens

The project has seen 470 metres of the canal relined above the village of Llangattock at a cost of £1.2m. This is in addition to the 180 metres of relining, which was completed in 2008 above the village of Dardy. This equates to 6600m2 in total or to put it into context, two thirds the